Implementing Lean Manufacturing at Siemens Magnet Technology, Eynsham, Oxfordshire, UK.
2011. 3. 16. 15:48ㆍ프로젝트/SCM
''Using a Witness model forced us to challenge in detail the methodology of our proposed LEAN production process.
The result was a change, not only in how we produce, but also how we control and measure production.''
John Laister SCM Process Manager