티스토리 뷰
A $147 million facility renovation plan at Sarasota Memorial Hospital sparked an effort to ensure that the newly designed/renovated space would be both effective and functional. Effectively, the space would meet business and operational goals while functionally optimizing the square footage available. Simulation was used to test department design at the blueprint stage. Clarifying operational objectives, gathering and summarizing data into a concise form, and testing the design through simulation, resulted in a project, which realized tremendous savings in construction and operational costs, and improved the patient process.
'프로젝트 > 금융.병원.콜센터' 카테고리의 다른 글
Agent Seating Optimisation within a Contact Centre (0) | 2010.05.19 |
---|---|
LANNER and WITNESS deliver for MADAME TUSSAUDS (0) | 2010.05.19 |
Business Improvement in Insurance Claims at (0) | 2010.05.19 |
Sheffield Teaching Hospitals NHS Trust Secure Additional Funding! (0) | 2010.05.19 |
Vertex Make the Right call (0) | 2010.05.18 |
최근에 올라온 글
최근에 달린 댓글
- Total
- Today
- Yesterday
TAG
- business change
- BPM
- Business Process Management
- 비지니스 프로세스 모델링
- digital transformation
- WITNESS Simulation
- Automotive
- 시뮬레이션
- 가상현실
- vr4cad
- 위트니스
- Witness
- Business Process Modeling
- 3d
- Discrete Event
- modeling
- simulation software
- VR
- Digital twin
- Process
- virtalis
- Optimization
- simulation
- Dynamicsoft
- visionary render
- dynamic soft
- 다이나믹소프트
- 시뮬레이션 강의
- cad
- WITNESS Simulation Dynamicsoft 다이나믹소프트 위트니스 시뮬레이션 강의 Business Process Modeling 비지니스 프로세스 모델링 Discrete Event Simulation Software
일 | 월 | 화 | 수 | 목 | 금 | 토 |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |
글 보관함