티스토리 뷰
A single simulation saved about £5 million by helping engineers develop a more efficient printed circuit board manufacturing process that eliminated the need for a third shift. Spreadsheet analysis originally showed that three shifts would be required to meet the manufacturing schedule to build new processors for the switch that serves as the backbone of the AT&T network. Hoping to improve the process, Lucent Technologies engineers performed a WITNESS simulation that provided a much more realistic model of the process and allowed them to quickly and inexpensively evaluate a wide range of alternatives. Working with the simulation, Lucent engineers improved routing logic and test mixtures and made other changes that increased productivity by about 50% without any additional expenditures.
'프로젝트 > 전기.전자' 카테고리의 다른 글
Simulating Fab Business Improvement at BAE SYSTEMS (0) | 2010.05.19 |
---|---|
Brammer PLC deploy the power of WITNESS throughout their Supply Chain (0) | 2010.05.19 |
Lanner Saves £100,000 for Cabletec (0) | 2010.05.19 |
WITNESS Helps HP Improve Inkjet Handling Process (0) | 2010.05.19 |
Motorola Boosts Distribution Centre Productivity (0) | 2010.05.19 |
최근에 올라온 글
최근에 달린 댓글
- Total
- Today
- Yesterday
TAG
- dynamic soft
- Business Process Modeling
- cad
- 시뮬레이션 강의
- digital transformation
- 3d
- 비지니스 프로세스 모델링
- business change
- BPM
- Witness
- 다이나믹소프트
- Automotive
- vr4cad
- Digital twin
- VR
- Business Process Management
- Dynamicsoft
- simulation software
- Discrete Event
- 시뮬레이션
- 가상현실
- Process
- WITNESS Simulation Dynamicsoft 다이나믹소프트 위트니스 시뮬레이션 강의 Business Process Modeling 비지니스 프로세스 모델링 Discrete Event Simulation Software
- modeling
- WITNESS Simulation
- 위트니스
- virtalis
- simulation
- visionary render
- Optimization
일 | 월 | 화 | 수 | 목 | 금 | 토 |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
글 보관함