The combined power of WITNESS and Lanner Consulting has once again produced some very impressive results in collaboration with Bournemouth & West Hampshire Water. Working within the Customer Services Bureau, the key outcomes achieved were:
At the IPLOCA 2000 Convention in Dubai, Dr Norman Sanderson offered to prepare articles for the IPLOCA Newsletter, describing aspects of the BP Pipeline Cost Reduction Project for the IPLOCA membership. The BP Pipeline Cost Reduction agenda includes activities in design, materials, welding, construction practices/equipment, operational aspects and project execution. This is the third of these ar..
When Brammer PLC, a leading pan-European added value distributor, with a workforce of almost 2000 throughout Europe, identified the need to radically redesign their inventory management system, and deployment topology, they turned to Lanner’s WITNESS simulation solution to assist them. They are targeting reductions in their inventory of between 10 and 20%, with improved service capability, repre..
Cabletec ICS Ltd (Cabletec) is a specialist reseller and manufacturer of high performance cable and associated products in a variety of sectors, including aerospace, rail, telecoms, energy, marine, military and general engineering. The business involves design, manufacture and sales of components with high quality standards and short lead-times.
Lanner Group’s visual interactive simulation software WITNESS has been used in the NHS to model bed occupancy. This case study was published following a WITNESS project carried out in Calderdale and Huddersfield NHS Trust. This piece of work formed part of a larger project (The PRISM Project) researching the use of simulation in HealthCare.
An advanced business simulation tool from Lanner has been used by Batchelors Foods (part of Campbell Grocery Products Ltd.) to ensure that a planned change to their supply chain would not be compromised by an adverse impact on inventory and customer service levels. The tool has helped to justify the planned changes by quantifying their overall cost/benefit and by identifying the requirement for ..
Many companies recognise that simulation modelling can significantly reduce the risk associated with major change. A recent project at Carlsberg-Tetley’s Northampton Brewery resulted in an envisaged requirement to install a third filter at a cost of £1m being avoided whilst the requirement to increase capacity by 33% was met. The best solution, identified through modelling, was not the obvious o..
- Total
- Today
- Yesterday
- Digital twin
- digital transformation
- 비지니스 프로세스 모델링
- VR
- Business Process Management
- WITNESS Simulation
- virtalis
- simulation software
- Business Process Modeling
- 다이나믹소프트
- 3d
- modeling
- business change
- Discrete Event
- Process
- 시뮬레이션 강의
- 위트니스
- visionary render
- simulation
- cad
- vr4cad
- Automotive
- WITNESS Simulation Dynamicsoft 다이나믹소프트 위트니스 시뮬레이션 강의 Business Process Modeling 비지니스 프로세스 모델링 Discrete Event Simulation Software
- Witness
- Optimization
- BPM
- 가상현실
- Dynamicsoft
- dynamic soft
- 시뮬레이션
일 | 월 | 화 | 수 | 목 | 금 | 토 |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 |