Scotland’s busiest international airport has seen dramatic growth over the past decade, with passenger numbers rising 60% since 1996. With demand for air travel set to grow, passenger numbers at Glasgow Airport could reach up to 15 million by 2015, and as much as 24 million by 2030.
In no other industry are there higher stakes to make the right operational decisions than the oil & gas industry. On the one hand, companies are under intense pressure to ensure that their operations reliably produce enough supply to meet customer delivery schedules. On the other hand, oil & gas operations require huge capital investments for everything from drilling equipment and pipelines to s..
The government’s white paper ‘Managing the Nuclear Legacy A Strategy for Action’ sets out its principles for nuclear decommissioning. Whilst safety, security and enviroment are of paraount importance, there is a clear focus on value for money and cost reduction. Research suggests that the actual clean up costs account for only 1/3rd of the total spend on nuclear liabilities, with 2/3rd linked to..
Effective change management is a crucial success factor in the automotive industry. Automakers and suppliers alike are under constant pressure to shorten lead times while reducing costs. Many companies have responded by implementing JIT and lean manufacturing methodologies that require continuous improvement to optimize efficiency and meetever tighter delivery targets. At the same time, consumer..
Modeling Component based Simulation This paper describes the development of a generic simulation tool (FORMAT) that uses modular building constructs to create imulation models of the transport of stock from internal stores to delivery points located around engine machining and assembly lines. The model is automatically built in a WITNESS shell containing a CAD factory layout displayed as the bac..
''Using a Witness model forced us to challenge in detail the methodology of our proposed LEAN production process. The result was a change, not only in how we produce, but also how we control and measure production.'' John Laister SCM Process Manager
- Total
- Today
- Yesterday
- virtalis
- Discrete Event
- 가상현실
- cad
- simulation
- 3d
- 비지니스 프로세스 모델링
- Dynamicsoft
- digital transformation
- Witness
- BPM
- WITNESS Simulation Dynamicsoft 다이나믹소프트 위트니스 시뮬레이션 강의 Business Process Modeling 비지니스 프로세스 모델링 Discrete Event Simulation Software
- Business Process Management
- dynamic soft
- VR
- 시뮬레이션 강의
- vr4cad
- 시뮬레이션
- 다이나믹소프트
- Automotive
- Process
- visionary render
- Digital twin
- Business Process Modeling
- modeling
- 위트니스
- WITNESS Simulation
- business change
- Optimization
- simulation software
일 | 월 | 화 | 수 | 목 | 금 | 토 |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 |